KitLog pro

Powered By Kitlog Pro v2.0

RANDY'S WEB SITE
' style=
Date:  7-3-2010
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Installed Landing Gear

Got out the wheels and brakes. Toqured the gear legs in place then attached the main gear axles. Greased the bearings and installed the main gear wheels. Installed the nose gear leg and bolted in place. Ran a piece of 7/16 althread through the nose gear axle wirh a nut on each end and chucked it up in the mill then turned it down to fit the nose wheel bearings. About .622" will slide through with a little friction. Fabricated the side spacers. Installed nose gear.
' style=

Sanding Nose wheel axle to size

Sanding Nose wheel axle to size

' style=

Standing on gear

Standing on gear

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.