Installed step attach angles. The primed parts look good! Did not prime or install the steps themselves. These will be done later with Akso and painted with the plane.
Installed F-1202F bulkhead.
Prepared and installed the F-1213 step floors. Had no trouble with the famous nutplate on the forward edge.
Prepared and installed vertical axis autopilot brackets. Had to drill out all rivets after installing without including baggage ribs! Time to quit; tired!