KitLog pro

Powered By Kitlog Pro v2.0

RAFAEL'S WEB SITE
' style=
Date:  7-5-2012
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Installed prop. Tail cone work.

Received throttle stops and installed. Adjusted for full travel.

Opened up the slot on the lower tail cone fairing.Installed the fairing. Checked for interference throughout control travel.

Safety wired AST hing pins.

Opened tailcone fairing bottom hole for further clearance of trim arm.

Installed propeller. Clamped spinner on. Set up straightedge and adjusted spinner for minimum runout.

Drilled pilot holes for spinner installation. Checked runout agin: OK.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.