Powered By Kitlog Pro v2.0
RAFAEL'S WEB SITE
RV-12
All
1-8-2012
< Previous Log Entry
Next Log Entry >
Date:
1-8-2012
Number of Hours:
3.50
Manual Reference:
Brief Description:
nose fairing
Clamped nose gear fairing with plumb lines installed. Drilled temporary holes and clecoed. Drilled fairing to gear leg. Tapped gear leg 8-32.
Applied flox and installed with #8 screws.
Fabricated hinge pin and retaining pin link.
Fairing on nose leg
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-12 Home
Category
# Logs
# Hours
All
264
1096
Avionics
14
64
Canopy
13
40
Classroom instructio
22
124
Cowling
18
64
Engine
17
70
Firewall fwd wiring
3
12
Fuel Tank
12
42
Fuselage
84
316
Landing gear and eng
5
16
Miscellaneous
3
12
Prop
1
4
Tailcone
22
124
Wheel Pants
13
48
Wings
37
160
Copyright © 2001-2024 Matronics. All Rights Reserved.