Worked on the upper deck today. Pre drilled Dimpled most parts. Manufactured braces and aluminum Angle attatch points as well. I did notice that I should have riveted some parts on with flush mounts before attatching the center bulk head. Just too hard to reach with a squeezer and it would have been much easier if I would have thought about the corect order to manufacture them in.