Powered By Kitlog Pro v2.0
Patricks Web Site
RV 9
All
12-4-2012
< Previous Log Entry
Next Log Entry >
Date:
12-4-2012
Number of Hours:
2.00
Manual Reference:
7
Brief Description:
Aileron Control rod
Finished priming and installing the Aileron push rod on both wings. Primed and sanded three times. I think it was too cold to prime but it finaly worked.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV 9 Home
Category
# Logs
# Hours
All
86
292
Empennage
37
130
Engine
2
3
Fuselage
30
114
Prop
1
1
Quick Build Wings
14
40
Wings
2
4
Copyright © 2001-2024 Matronics. All Rights Reserved.