KitLog pro

Powered By Kitlog Pro v2.0

Patricks Web Site
' style=
Date:  10-25-2012
Number of Hours:  3.00
Manual Reference:  6
Brief Description:  Rudder

This morning I discoverd that I riveted the bottom of the rudder together with out manufacturing and installing the mounting bracket for the bottom fiberglass. Ooops.. So I drilled out all the rivets on the bottom and made the bottom bracket, and put it back together. There is an hour and a half of my life I can not get back. I also was able to roll the front leading edge tonight. It turned out ok except for a couple of little gaps in the overlap. tried fixing it a few times but to noavail it still remained. Was also able to manufacture the trailing edge clamp to begin the bonding process. I also counter sunk both sides of the Trailing edge "V" angle as well
' style=

Bottom of the leading edge

Bottom of the leading edge

' style=

Top of the leading edge

Top of the leading edge

' style=

Preping to seal trailing edge

Preping to seal trailing edge

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.