KitLog pro

Powered By Kitlog Pro v2.0

Patricks Web Site
' style=
Date:  7-17-2012
Number of Hours:  2.00
Manual Reference:  Section 6
Brief Description:  Drilling and first assemble of HS frame

Drilled all 1/8 th holes to # 30 for HS sub frame. The next step is to manufacture the HS 908 R-L and match drilling to the forward spar and support. HS 912 have been match drilled and labled to be replaced in the proper spot. I will begin labling parts so I can replace them in the correct spot upon reassembly.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.