KitLog pro

Powered By Kitlog Pro v2.0

Magnificent Adventure
' style=
Date:  7-29-2013
Number of Hours:  6.00
Manual Reference:  Section 11
Brief Description:  Finishing Air Scoop opening

Finished the work on the air intake today. I also worked on the oil door in the top cowling. I reinforced the perimeter of the opening with .025 aluminum and fiberglassed it in. The metal edges seemed to be better for the latches to attach to and should last longer.
' style=

Finished air intake

Finished air intake

' style=

Oil Door inside view

Oil Door inside view

' style=

Oil Door Top View

Oil Door Top View

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.