Removed the canopy and frame from fuselage to prep for sikaflex application around the front canopy frame. Sanded aluminum and canopy and taped application area. Sikaflex went smoothly and I now have the canopy glued and bolted to the frame.
I also decided to replace the fuel line between the F.I. Pump and the firewall bulkhead fitting. Installed a firewall doubler for the bulkhead fitting, also.