Powered By Kitlog Pro v2.0
Magnificent Adventure
RV-9A
Canopy
8-29-2012
< Previous Log Entry
Next Log Entry >
Date:
8-29-2012
Number of Hours:
5.00
Manual Reference:
Section 9
Brief Description:
Canopy Drilling
Today, I got up the nerve to drill the canopy to final size and counter sink the holes.
I rivited on the side skins and got ready to paint the entire interior of the frame.
Finally
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
272
1569
Avionics
10
52
Canopy
29
159
Electrical
19
103
Empennage
40
197
Engine
16
100
Final Assembly
1
2
Finish Kit
11
78
Firewall Fwd
22
124
Flying
2
8
Fuselage
51
296
Miscellaneous
23
110
Shop Supplies
2
8
Tools
1
2
Transportation and T
1
56
Wings
44
274
Copyright © 2001-2024 Matronics. All Rights Reserved.