Powered By Kitlog Pro v2.0
Magnificent Adventure
RV-9A
Empennage
4-27-2011
< Previous Log Entry
Next Log Entry >
Date:
4-27-2011
Number of Hours:
5.00
Manual Reference:
Section 6
Brief Description:
Finish HS skin riveting
Riveted the right side skin to the spars and ribs and did final assembly of the main part of the horizontal stabilizer. Hung it on the ceiling for the time being. Next will be starting on the elevator construction.
Looks straight and true
Final touches
Space is valuable
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
272
1569
Avionics
10
52
Canopy
29
159
Electrical
19
103
Empennage
40
197
Engine
16
100
Final Assembly
1
2
Finish Kit
11
78
Firewall Fwd
22
124
Flying
2
8
Fuselage
51
296
Miscellaneous
23
110
Shop Supplies
2
8
Tools
1
2
Transportation and T
1
56
Wings
44
274
Copyright © 2001-2024 Matronics. All Rights Reserved.