Powered By Kitlog Pro v2.0
Magnificent Adventure
RV-9A
All
10-30-2013
< Previous Log Entry
Next Log Entry >
Date:
10-30-2013
Number of Hours:
10.00
Manual Reference:
Brief Description:
Prepare for Hangar move
Most of the last week has been packing up for the move to the hangar. Two and 1/2 years of building (minus 7+ months when I was gone) in the garage will change to building in the hangar at the Olympia Airport.
Packing up small items
A builder must eat and drink
Nose cone and aircraft fairings
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
272
1569
Avionics
10
52
Canopy
29
159
Electrical
19
103
Empennage
40
197
Engine
16
100
Final Assembly
1
2
Finish Kit
11
78
Firewall Fwd
22
124
Flying
2
8
Fuselage
51
296
Miscellaneous
23
110
Shop Supplies
2
8
Tools
1
2
Transportation and T
1
56
Wings
44
274
Copyright © 2001-2024 Matronics. All Rights Reserved.