Powered By Kitlog Pro v2.0
Magnificent Adventure
RV-9A
All
2-20-2012
< Previous Log Entry
Next Log Entry >
Date:
2-20-2012
Number of Hours:
6.50
Manual Reference:
Section 8
Brief Description:
Emmpanage Mounting
Mounted the elevators and trim tab. Spent some time adjusting the up and down elevator travel. Up stop and down stop required quite a bit of adjusting (filing). I have an average of approximately 28 degrees up and 22 degrees down movement.
Elevators attached
From the front view
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
272
1569
Avionics
10
52
Canopy
29
159
Electrical
19
103
Empennage
40
197
Engine
16
100
Final Assembly
1
2
Finish Kit
11
78
Firewall Fwd
22
124
Flying
2
8
Fuselage
51
296
Miscellaneous
23
110
Shop Supplies
2
8
Tools
1
2
Transportation and T
1
56
Wings
44
274
Copyright © 2001-2024 Matronics. All Rights Reserved.