Powered By Kitlog Pro v2.0
Pisandros Web Site
SLING 2
Fuselage
1-11-2016
< Previous Log Entry
Next Log Entry >
Date:
1-11-2016
Number of Hours:
2.20
Manual Reference:
Brief Description:
Botton skin
Completed the riveting ot the bottonrear skin. And some of the side rear skin. Also ran all the wires for VOR, strobe light, and elevator trim. All electric wires were ran on the pilot side, signal wire on the passanger side.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
SLING 2 Home
Category
# Logs
# Hours
All
291
525
Ailerons
2
6
Elevator
14
29
Empennage
2
2
Flaps
3
8
Fuel tanks
11
19
Fuselage
158
219
Horizontal stibilize
8
26
Left wing
42
76
None
4
2
Right wing
23
64
Rudder
7
17
Shop Supplies
2
4
Throttle
1
2
Vertical stabilizer
7
18
Wings
7
33
Copyright © 2001-2024 Matronics. All Rights Reserved.