Powered By Kitlog Pro v2.0
Pisandros Web Site
SLING 2
Fuselage
1-5-2016
< Previous Log Entry
Next Log Entry >
Date:
1-5-2016
Number of Hours:
2.50
Manual Reference:
Brief Description:
Ribs
I put together Ribs 1-5, not a dificult task, adnusidn the jig went pretty easy, I did have to rib 5, some how I managed to get it backwards. Easy Fix. By 10;30 pm, was time to calledl it for the night.
Birds checking on the bird.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
SLING 2 Home
Category
# Logs
# Hours
All
291
525
Ailerons
2
6
Elevator
14
29
Empennage
2
2
Flaps
3
8
Fuel tanks
11
19
Fuselage
158
219
Horizontal stibilize
8
26
Left wing
42
76
None
4
2
Right wing
23
64
Rudder
7
17
Shop Supplies
2
4
Throttle
1
2
Vertical stabilizer
7
18
Wings
7
33
Copyright © 2001-2024 Matronics. All Rights Reserved.