Powered By Kitlog Pro v2.0
Pisandros Web Site
SLING 2
Elevator
10-1-2014
< Previous Log Entry
Next Log Entry >
Date:
10-1-2014
Number of Hours:
0.75
Manual Reference:
Brief Description:
Alodined all parts.
Toady I had some time, and got all the parts alodined. Next step will be to have them prime, and start putting everything together.
Elevator parts alodined.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
SLING 2 Home
Category
# Logs
# Hours
All
291
525
Ailerons
2
6
Elevator
14
29
Empennage
2
2
Flaps
3
8
Fuel tanks
11
19
Fuselage
158
219
Horizontal stibilize
8
26
Left wing
42
76
None
4
2
Right wing
23
64
Rudder
7
17
Shop Supplies
2
4
Throttle
1
2
Vertical stabilizer
7
18
Wings
7
33
Copyright © 2001-2024 Matronics. All Rights Reserved.