Powered By Kitlog Pro v2.0
Pisandros Web Site
SLING 2
All
2-18-2016
< Previous Log Entry
Next Log Entry >
Date:
2-18-2016
Number of Hours:
0.50
Manual Reference:
Brief Description:
A missing part arrive today, was one of the angles that hold the bushings on the pedals. Was prep, and put in place. Back rest are done and out of the way for now.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
SLING 2 Home
Category
# Logs
# Hours
All
291
525
Ailerons
2
6
Elevator
14
29
Empennage
2
2
Flaps
3
8
Fuel tanks
11
19
Fuselage
158
219
Horizontal stibilize
8
26
Left wing
42
76
None
4
2
Right wing
23
64
Rudder
7
17
Shop Supplies
2
4
Throttle
1
2
Vertical stabilizer
7
18
Wings
7
33
Copyright © 2001-2024 Matronics. All Rights Reserved.