Powered By Kitlog Pro v2.0
Pisandros Web Site
SLING 2
All
2-12-2015
< Previous Log Entry
Next Log Entry >
Date:
2-12-2015
Number of Hours:
2.00
Manual Reference:
Brief Description:
Jig leveled
I set up, leveled, and secure the jig. It took few trips between both end of the wing, but i got it just right. I then started to cleco all the ribs.
Root side
Tip side
Clecoed some ribs
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
SLING 2 Home
Category
# Logs
# Hours
All
291
525
Ailerons
2
6
Elevator
14
29
Empennage
2
2
Flaps
3
8
Fuel tanks
11
19
Fuselage
158
219
Horizontal stibilize
8
26
Left wing
42
76
None
4
2
Right wing
23
64
Rudder
7
17
Shop Supplies
2
4
Throttle
1
2
Vertical stabilizer
7
18
Wings
7
33
Copyright © 2001-2024 Matronics. All Rights Reserved.