Powered By Kitlog Pro v2.0
Pisandros Web Site
SLING 2
All
10-8-2014
< Previous Log Entry
Next Log Entry >
Date:
10-8-2014
Number of Hours:
3.00
Manual Reference:
Brief Description:
Strobe light
I set up the strobe light on the Rodder, happy with the way it came out. Will leave the tip off until final assembly to avoid being damage during storage.
Hole and rivet nuts done
Strobe light
Light on.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
SLING 2 Home
Category
# Logs
# Hours
All
291
525
Ailerons
2
6
Elevator
14
29
Empennage
2
2
Flaps
3
8
Fuel tanks
11
19
Fuselage
158
219
Horizontal stibilize
8
26
Left wing
42
76
None
4
2
Right wing
23
64
Rudder
7
17
Shop Supplies
2
4
Throttle
1
2
Vertical stabilizer
7
18
Wings
7
33
Copyright © 2001-2024 Matronics. All Rights Reserved.