KitLog pro

Powered By Kitlog Pro v2.0

Pisandros Web Site
' style=
Date:  1-15-2015
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Finishing up the VS.

Since tempeture here has being great in the las few months, have spend a lot of tiem buiding, and not much updating. The VS is now done, and put away. Few issues to mention, some of the part were not alingned 100%. Afte a call to the AF n CA, I was assure the tolerance was strong enough to re-drill the holes. Aside from that everything else was fine.
' style=

A bit of re-drilling.

A bit of re-drilling.

' style=

Wire in, Skeleton done.

Wire in, Skeleton done.

' style=

Grommet set.

Grommet set.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.