Powered By Kitlog Pro v2.0
Pisandros Web Site
SLING 2
All
10-1-2014
< Previous Log Entry
Next Log Entry >
Date:
10-1-2014
Number of Hours:
0.50
Manual Reference:
Brief Description:
All rudder parts alodined, and ready for primer. Temperature should be in the 80s this weekend, if that is the case, will get al parts prime, and if time permits will get some assembling done.
Drying up.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
SLING 2 Home
Category
# Logs
# Hours
All
291
525
Ailerons
2
6
Elevator
14
29
Empennage
2
2
Flaps
3
8
Fuel tanks
11
19
Fuselage
158
219
Horizontal stibilize
8
26
Left wing
42
76
None
4
2
Right wing
23
64
Rudder
7
17
Shop Supplies
2
4
Throttle
1
2
Vertical stabilizer
7
18
Wings
7
33
Copyright © 2001-2024 Matronics. All Rights Reserved.