KitLog pro

Powered By Kitlog Pro v2.0

Hamiltons RV Website
' style=
Date:  10-13-2012
Number of Hours:  4.00
Manual Reference:  6.3.1-2
Brief Description:  VS Skeleton

Started the session by deburring each of the components in the VS skeleton. Two inspar ribs, two nose ribs, the top rib and the forward spar. Using a 1 inch scotchbrite makes the lightening holes very easy, just run around a couple of times does the trick. The wheel wears pretty fast with the thin metal, but it leaves a very good finish. The flange edges, require emery cloth or paper to get into them effectively.

Deburing the VS skeleton components was pretty easy. I ran the spar through the 6 inch scotchbrite wheel and used emery cloth for the inaccessible areas. The others were done with the 1 inch wheel and emery cloth.

The skeleton was then match drilled.
' style=

Skeleton partially enclosed

Skeleton partially enclosed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.