KitLog pro

Powered By Kitlog Pro v2.0

Hamiltons RV Website
' style=
Date:  9-1-2012
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Finished Painting and Commenced Floating Work Tabl

The First task was to complete the paint job. Ryan and I have completed the painting of the Garage/Workshop. For the roof we used ceiling white, and for the walls, semigloss white over the besser block. I should have redone the pointing first, but it is only a garage... The floor is dark green. The white walls and ceiling make a substantial difference to the lighting levels everywhere. Where in the past I had to turn on a set of workshop lights, now I rarely need them. (Until I am looking for a rivet on the floor that is...)

The second task is to complete the fitout with a wall bench, a floating work station with Linisher/Grinder, Scotchbrite wheels in a cheep grinder and a cheap band saw.

I have completed the Wall bench which is 2.4 meters long 600 wide and about 900 off the ground. It has a storage shelf underneath which should come in handy.

I also added some ply sheet to my Triton Wood store shelves to make them a bit more useful. Photo is a recent one).
' style=

Wall Bench

Wall Bench

' style=

Triton Wood Store with Ply Shelves

Triton Wood Store with Ply Shelves

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.