Powered By Kitlog Pro v2.0
Peters Web Site
CH650B
All
11-1-2008
< Previous Log Entry
Next Log Entry >
Date:
11-1-2008
Number of Hours:
2.00
Manual Reference:
6-T-3B pg 8-10
Brief Description:
made upper and lower elevator and drilled doubler
drilled the doubler to the top and bottom Horns. cut the L angles, marked their placement and drilled them to the elevator.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
CH650B Home
Category
# Logs
# Hours
All
58
115
Empennage
48
101
Miscellaneous
3
0
Wings
7
14
Copyright © 2001-2024 Matronics. All Rights Reserved.