Powered By Kitlog Pro v2.0
Peters Web Site
CH650B
All
5-3-2008
< Previous Log Entry
Next Log Entry >
Date:
5-3-2008
Number of Hours:
4.00
Manual Reference:
6-T-1A pg 7 - 10
Brief Description:
attachment 6T2-2 and 6T2-1 to front spar
clamped the plywood template to the front spar matching the center line
clamped the attachment doubler 6T2-2 at the ends of the plywood template
verified edge distance of the spar to doubler
drilled and cleco'd 6T2-2 (used #30 drill..undersize)
clamped the front spar attachment 6T2-1 to the side of the atachment doubler 6T2-2
ensured the tops lined up
drilled and cleco'd 6T2-1
disassembled the 6T2-2 and drew a rivet line, and marked three rivet drill points
re-cleco'd and drilled the 6T2-1 to 6T2-2
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
CH650B Home
Category
# Logs
# Hours
All
58
115
Empennage
48
101
Miscellaneous
3
0
Wings
7
14
Copyright © 2001-2024 Matronics. All Rights Reserved.