Powered By Kitlog Pro v2.0
Patricks Web Site
RV-7A
Empennage
11-5-2005
< Previous Log Entry
Next Log Entry >
Date:
11-5-2005
Number of Hours:
4.00
Manual Reference:
Brief Description:
Cut tabs on L Elevator
Per discussion with Vans, removed faulty tabs outboard of trim tab. Tabs were over bent and dented by me in the original fabrication process. It was determined that replacing them with a fabricated rib would be a better choice. Fabricated rib,
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV-7A Home
Category
# Logs
# Hours
All
82
271
A/C Hardware & Supplies
1
3
Empennage
39
142
Fuselage
2
4
Wings
40
122
Copyright © 2001-2024 Matronics. All Rights Reserved.