Installed a cable tie mount on the bottom of the vertical stab. for the beacon cable. Also continous grommet around two lightning holes where the trim wiring will be installed. Deciding whether to install a "control cable fairing " over the elevator trim clevis. Tested the trim motor and set the trim tab to 8 degrees nose up at full nose up extension.