KitLog pro

Powered By Kitlog Pro v2.0

Peters Web Site
' style=
Date:  4-21-2020
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Electrical.

Installed continuous grommet on three lightning holes.
Threaded the elevator trim, vertical stab. and cabin light wires into a common braided cable sleeve, as they all go to a plug.
' style=

Trim ,Cabin Lts, Vert. Stab. wires

Trim ,Cabin Lts, Vert. Stab. wires

' style=

Continuous grommet.

Continuous grommet.

' style=

Cable standoff.

Cable standoff.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.