KitLog pro

Powered By Kitlog Pro v2.0

Peters Web Site
' style=
Date:  1-26-2020
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Painting.

Retrieved the vertical stab. and rudder from the the storage shed, I have started preparing them for painting.
Richard will paint the horizontal stab., elevator, vertical Stab. and rudder at the same time, as they all fit into his spray booth.
I moved the hole for the beacon wiring on the rudder to the side.
My rudder is an early edition and the hole for wiring was in the middle. ( as you can see in the photo )
' style=

Beacon wiring hole moved.

Beacon wiring hole moved.

' style=

Vertical stab. and rudder.

Vertical stab. and rudder.

' style=

Rudder.

Rudder.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.