KitLog pro

Powered By Kitlog Pro v2.0

Peters Web Site
' style=
Date:  2-12-2017
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Filling Rivet Heads.

Finished filling rivet heads on the left hand side of the aircraft.
The canopy join and undercarriage channel cover rivets will be filled later after the canopy and undercarriage are finally installed.
It's a big job finished, filling hundreds of rivet heads on the fuselage, top, bottom and both sides.
Now I have to sand all the rivet heads back, which will take quite some time.
It has been extremely hot here in New South Wales ( NSW Australian State ) over the past couple of days, temperature range between 41- 47 degrees C, can only work in the shed in the morning for a few hours.
Autumn is on its way soon, which will be wonderful.
' style=

Left side.

Left side.

' style=

Luggage door.

Luggage door.

' style=

Rivet heads filled.

Rivet heads filled.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.