KitLog pro

Powered By Kitlog Pro v2.0

Peters Web Site
' style=
Date:  9-6-2023
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Hardware.

I have organised all the hardware I require to install the empennage, wings, flaps and ailerons.
I have placed the build manual instructions and required hardware in individual plastic bags.
This should make assembly much easier and quicker once the aircraft is at the airport.
I installed one landing light to ensure it fits, which it does.
I will remove it and install electrical connectors for the four lights ( two flood and two spot ).
' style=

Hardware itemised and packaged.

Hardware itemised and packaged.

' style=

Hardware.

Hardware.

' style=

Landing light.

Landing light.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.