KitLog pro

Powered By Kitlog Pro v2.0

Peters Web Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  8-9-2022
Number of Hours:  3.00
Manual Reference:  
Brief Description:  GDL50R Mount.

I decided to re-do the mounts for the GEA24 and GDL50R.
I have used heavier material and re located the anchor points.
The unit now sits higher on the front top rib, which is much better.
I installed strengthening ribs, installed rivnuts and primed the mount.
I will install it back behind the panel tomorrow.
' style=

Ready for priming.

Ready for priming.

' style=

Ribs and rivnuts installed.

Ribs and rivnuts installed.

' style=

Mount primed.

Mount primed.

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.