KitLog pro

Powered By Kitlog Pro v2.0

Peters Web Site
' style=
Date:  2-11-2020
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Instrument Panel.

Spent today working on the instrument panel.
The dash did not have all the rivnuts for the instrument panel installed and one rivnut had to be re-positioned as the hole in the panel was drilled in the incorrect position. ( 10mm out )
The only way I could find the position for the rivnuts was to install the panel to the dash, a tricky manoeuver with all the wiring attached to the switches, warning lights and CB's etc.
KSC and I managed to position the panel into place and I match drilled the holes for the rivnuts.
There were two rivnuts required at the top of the panel and four at the bottom, plus one rivnut which had to be re-positioned.
KSC came out to help many times during the day, I could not have done the job without the extra set of hands, thankyou. ( just as well she lives close, as wives tend to do. )
' style=

Panel installed.

Panel installed.

' style=

Four screws at the bottom.

Four screws at the bottom.

' style=

Two screws at the top.

Two screws at the top.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.