KitLog pro

Powered By Kitlog Pro v2.0

Peters Web Site
' style=
Date:  12-21-2017
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Main Gear Wheel Spats.

Finally found some time to get into the shed.
AEC and I got the main gear wheel spats down from the roof stowage.
I have installed them temporarily as rivnuts and a couple of holes still need to be done.
My family wishes everyone a Merry Christmas and a safe a happy new year.
All my family will be home for Christmas day, which is wonderful.
This time next year I hope we are very nearly flying the Sling, time will tell.
' style=

Main wheel spats .

Main wheel spats .

' style=

Looks better with spats on.

Looks better with spats on.

' style=

Rivnuts and holes to go.

Rivnuts and holes to go.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.