KitLog pro

Powered By Kitlog Pro v2.0

Peters Web Site
' style=
Date:  10-26-2017
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Luggage Locker Floor.

I "bit the bullet" and took to the luggage locker and started riveting.
So the luggage locker floor, back seat strengthening channel and luggage floor support channel are all riveted into position and will not be coming out.
It all went together very well, every hole lined up perfectly ( occasionally a little bit of encouragement was required ).
' style=

Luggage locker.

Luggage locker.

' style=

Luggage locker.

Luggage locker.

' style=

Luggage locker completed.

Luggage locker completed.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.