KitLog pro

Powered By Kitlog Pro v2.0

Peters Web Site
' style=
Date:  8-10-2017
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Elevator and Horizontal Stab.

I started filling rivets today.
I did the top of the elevator and horizontal stab. in about one hour.
I also started on installing two rivnuts on the firewall to support the electrical regulator which is on the inside of the firewall.
The two 6 mm rivnuts holes were not drilled during manufacture.
I need a 9 mm Christmas tree drill, which I do not have, so the holes will have to wait until my next visit to the hardware store.
' style=

Horizontal stab. and elevator.

Horizontal stab. and elevator.

' style=

Right tip.

Right tip.

' style=

Left tip.

Left tip.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.