KitLog pro

Powered By Kitlog Pro v2.0

Peters Web Site
' style=
Date:  3-13-2024
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Preparing Aircraft For Engine Run.

A numbe of small jobs this morning before engine run and first taxi.
Installed the spinner which is very straight forward once you have the alignment marks matched.
Finally removed the windscreen plastic protective film, which I have been wanting to do for quite some time.
Engine run and taxiing all went very well.
KSC sat with me in the aircraft during the ground run and helped to monitor engine instruments and give advice.
' style=

Waiting for spinner.

Waiting for spinner.

' style=

Spinner ready.

Spinner ready.

' style=

Spinner installed.

Spinner installed.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.