I picked up the righthand fuel line from the company doing the silver soldering today. When I dropped the line off I spoke to a gentleman for about twenty minutes explaining what was required with diagrams and measurements. However, when the soldering was done it was done by someone else who did not understand what was required. ( discussion, measurements and diagram was a waste of time ). The gap between the two barbs is about 7-10mm too short, not allowing the FT-60 ( fuel flow sensor ) to fit into position. I will take the fuel line back tomorrow and they can re-solder the barb, on the banjo end, closer to the bend, giving me the extract gap required.