KitLog pro

Powered By Kitlog Pro v2.0

Lightning N730AL Build Log
' style=
Date:  8-12-2007
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Main landing gear

Repositioned the fuselage so that the fuselage is upside down. Used a die grinder to open the holes for the landing gear legs. Measured location for the gear leg sockets which were located on the inside and transfered the measurement to the outside of the fuselage. Started with a small hole and expanded the hole until the gear legs fit.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.