KitLog pro

Powered By Kitlog Pro v2.0

Lightning N730AL Build Log
' style=
Date:  7-30-2007
Number of Hours:  8.00
Manual Reference:  5.1
Brief Description:  Built spar box

Verified spar box parts were not damaged during transport
Reamed paint from all holes in spar box with drill bit before assembly
Installed two cable guides with AN3-10A bolts, washers and AN365-10 Nyloc nuts
Positioned nylon cable guides on bottom tube of truss
Temporarly Installed flap torque tube
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.