KitLog pro

Powered By Kitlog Pro v2.0

Lightning N730AL Build Log
' style=
Date:  8-6-2007
Number of Hours:  24.00
Manual Reference:  
Brief Description:  Wings paint prep

The greatest amount of time is spent doing the body work on the aircraft. First, body filler is troweled on to the surface of the stab and left to harden. After hardening, it is then sanded to smooth and level the surface. This is done in multiple sessions with LOTS of sanding in between!
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.