KitLog pro

Powered By Kitlog Pro v2.0

N2724G RV9 Build Log
' style=
Date:  10-29-2008
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Steps

Drilled & clecoed right side step.

Drilled both nylon steps brackets and attached to step assembly.

Riveted steps.

1.5 hrs me
1.0 Beth
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.