Powered By Kitlog Pro v2.0
N2724G RV9 Build Log
RV-9A
Fuselage
7-1-2008
< Previous Log Entry
Next Log Entry >
Date:
7-1-2008
Number of Hours:
5.00
Manual Reference:
Brief Description:
Began Final Assembly of Center Section
Beth riveted platenuts onto seat ribs.
Riveted and bolted/torqued 916 seat ribs to 904 aft center spar.
Clecoed aft baggage ribs to 705 bulkheads and seat ribs.
2.5 hrs each
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
524
2143
Avionics
40
227
Empennage
56
195
Engine
36
182
Fuselage
224
908
Miscellaneous
3
0
Wings
165
631
Copyright © 2001-2024 Matronics. All Rights Reserved.