Powered By Kitlog Pro v2.0
N2724G RV9 Build Log
RV-9A
Wings
4-1-2008
< Previous Log Entry
Next Log Entry >
Date:
4-1-2008
Number of Hours:
3.50
Manual Reference:
Brief Description:
Aileron Hinge Points & Gap Fairings
Beth clecoed and started squeezing the flap gap fairings to the rear spar.
I bolted & torqued the aileron hinge points to both ailerons - FINISHED PARTS!
Drilled inboard brackets to both flaps.
Me 2 hrs
Beth 1.5 hrs
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
524
2143
Avionics
40
227
Empennage
56
195
Engine
36
182
Fuselage
224
908
Miscellaneous
3
0
Wings
165
631
Copyright © 2001-2024 Matronics. All Rights Reserved.