KitLog pro

Powered By Kitlog Pro v2.0

N2724G RV9 Build Log
' style=
Date:  2-11-2008
Number of Hours:  3.25
Manual Reference:  
Brief Description:  Misc Tank Prep

Scotchbrited the rear baffle.

Fabricated the fuel pickup assembly and drilled the anti-rotation brackets.

cut vent line to rough length and fluted one end.

Fabricated both aileron control stops.

Prepped the aileron brackets for priming.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.