KitLog pro

Powered By Kitlog Pro v2.0

N2724G RV9 Build Log
' style=
Date:  2-8-2008
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Right Tank Prep

Fitted / drilled capacitive plates on to tank ribs.

Fitted / drilled fuel filler and drain flange to tank skin.

Beth soldered off the blue plastic.

We deburred all skin holes the dimpled with special tank dies.

P&B 3hrs each
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.