Powered By Kitlog Pro v2.0
N2724G RV9 Build Log
RV-9A
Wings
2-5-2008
< Previous Log Entry
Next Log Entry >
Date:
2-5-2008
Number of Hours:
2.00
Manual Reference:
Brief Description:
Rebuilt AEX Tiedown
Put right wing on stand and rebuilt the right wing AEX tiedown bracket. Made an attempt to leak test the tank with ballons with out much luck. Couldn't get the ballons attached without poking holes in the ballons.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
524
2143
Avionics
40
227
Empennage
56
195
Engine
36
182
Fuselage
224
908
Miscellaneous
3
0
Wings
165
631
Copyright © 2001-2024 Matronics. All Rights Reserved.