KitLog pro

Powered By Kitlog Pro v2.0

N2724G RV9 Build Log
' style=
Date:  1-29-2008
Number of Hours:  9.50
Manual Reference:  
Brief Description:  Proseal Tank Baffle

This made for a very long night... Put a bead of Proseal around the perimeter of the tank skin then buttered up the baffle itself. Placed the baffle in the tank frame and put a cleco in every hole. Used the pneumatic squeezer to squeeze the rivets around the edge the put the spar attach brackets in with pop rivets.

Paul 5 hours
Beth 4.5 hours
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.