KitLog pro

Powered By Kitlog Pro v2.0

N2724G RV9 Build Log
' style=
Date:  1-1-2008
Number of Hours:  3.50
Manual Reference:  
Brief Description:  More Tank Prep

Fabricated left tank leading edge doublers, both in board and outboard. Drilled out the 90 deg attach bracket to the inboard rib. Drilled out the temporay pop rivets that attached the Z brackets to the baffle then drilled Z brackets for platenuts and countersunk. Got Beth to help me with attaching the three tank attach nutplates to the main spar... this was a bitch!
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.